Russian Navy


SSBN Yury Dolgoruky completed another trial phase – Sevmash


SSBN Yury Dolgoruky completed another trial phase – Sevmash 01.09.2011
Text: Sevmash Press Service
Photo: Sevmash shipyard meets the crew of SSBN Yury Dolgoruky. sevmash.ru
Onboard systems of SSBN Yury Dolgoruky were tested during the 5-day cruise. However, the main mission was test launch of SLBM Bulava at the maximum flight range. The underwater launch was held in the morning of Aug 27. Bulava had delivered all warheads to assigned region of the Pacific Ocean at the stated time.

The sub and her crew headed by Capt 1 rank Vladimir Shirin were met by Director General of JSC Sevmash Andrei Diachkov, his deputy Mikhail Budnichenko, and chief of shipbuilding department Vladimir Prokofiev.

According to acting Sevmash's deputy director for defense production Sergei Marichev, the trial plan has been completed in full. "Apart from Bulava launch, one of the trial tasks was to test full speed mode, and it was done. Also, the state inter-agency commission inspected tactical control systems", said Marichev.

Back to the list





Back to news list


Copyright © 1998-2012 RusNavy.com. All materials contained in this Website are protected by copyright laws and may not be reproduced, republished, distributed, transmitted, displayed, broadcast or otherwise exploited in any manner without the express prior written permission from the editorial staff. The editorial staff. Site created by ProLabs. Russian version.