Russian Navy


MPK-7 Onega



Project 1124M ship. Photo by A. Brichevsky (flot.sevastopol.info)

MPK-7 Onega is a Project 1124M Small ASW Ship (SAS).

REGISTRATION

Northern Fleet

CONSTRUCTION, NAME

The ship was laid down in 1990 at Zelenodolsk shipyard; launched and commissioned in 1991.

MILESTONES

In 2007 the ship was laid up for recovery of technical operability; its service life was prolonged.

Before repairs, the ship every year participated in the fleet's head-quarter and tactical training exercises.

The ship is currently under repair.

PERFORMANCE

Speed: 35 knots
Operational range: 2,700 miles
Crew: 89 men

DIMENSIONS

Displacement: 930 tonnes
Extreme length: 71.07 meters
Extreme beam: 10.15 meters
Extreme draft: 3.71 meters

PROPULSION

Diesel gas turbine M-8M
18,000 shp gas turbine GTU-8
2 diesels M-507A, total power 20,000 shp
3 diesel generators (DG-500, DG-300, DG-200), total power 1,000 kW

ARMAMENT

76-mm gun mount AK-176
30-mm gun mount AK-630M
Osa-MA SAM launcher
2 coupled 533-mm torpedo tubes
RBU-6000 antisubmarine rocket launcher
12 depth bombs or 18 mines


Copyright © 1998-2012 RusNavy.com. All materials contained in this Website are protected by copyright laws and may not be reproduced, republished, distributed, transmitted, displayed, broadcast or otherwise exploited in any manner without the express prior written permission from the editorial staff. The editorial staff. Site created by ProLabs. Russian version.