Photo:
Combat Capability [42%],
Role and Missions,
Structure of the Navy,
in-service ships, surface ships, submarines, chronology.
Tell a friend | Print version |
---|
Caspian Flotilla to Get Three Serna Landing Boats within Two Years
28.11.2012
In the nearest two years, Caspian Flotilla (CF) will receive three Project 11770 Serna landing boats; that will considerably improve landing capability of the flotilla, reported RIA Novosti referring to a spokesman for the Russian Navy.
Besides, construction of landing ship Ivan Gren is going on at Yantar shipyard in Kaliningrad for Russian Navy.
That large-size landing ship was laid down in Dec 2004, but construction went slowly due to non-systematic financing and lack of professional staff. The ship was put afloat on May 18, 2012 and is to be handed over to defense ministry in 2013, reports RIA Novosti.
Besides, construction of landing ship Ivan Gren is going on at Yantar shipyard in Kaliningrad for Russian Navy.
That large-size landing ship was laid down in Dec 2004, but construction went slowly due to non-systematic financing and lack of professional staff. The ship was put afloat on May 18, 2012 and is to be handed over to defense ministry in 2013, reports RIA Novosti.
Back to news list