Russian Navy


Indian submarine to join navy after delayed refit in Russia


30.07.2008 Source: en.rian.ru

The INS Sindhuvijay diesel-electric submarine will set sail for India on August 5 to rejoin the Indian navy after an extensive overhaul at a shipyard in northern Russia, the company said on Tuesday.

The Project 877EKM Kilo-class submarine had been undergoing a refit at the Zvezdochka shipyard in Severodvinsk since 2005.

The overhaul was delayed for six months due to the unacceptable performance of its new SS-N-27 Club-S cruise missiles. In six consecutive pre-delivery test firings in September - November 2007, the Club missiles failed to find their targets and India refused to accept the delivery until all the problems had been fixed.

The Club-S subsonic cruise missile is designed for launch from a 533 mm torpedo tube, or a vertical launch tube. It has a range of 160 nautical miles (about 220 km). It uses an ARGS-54 active radar seeker and Glonass satellite and inertial guidance.

The new trials were completed in mid-July and were successful.

Sindhuvijay is the 4th Indian navy submarine to have been refitted at the Zvyozdochka shipyard.

The upgrade program also involved a complete overhaul of the submarine, including its hull structure, as well as improved control systems, sonars, electronic warfare systems, and an integrated weapon control system. The upgrades reportedly cost about $80 million.

Russia's Kilo-class diesel-electric submarines have gained a reputation as extremely quiet boats, and have been purchased by China, India, Iran, Poland, Romania and Algeria.

Back to the list





Back to news list


Copyright © 1998-2012 RusNavy.com. All materials contained in this Website are protected by copyright laws and may not be reproduced, republished, distributed, transmitted, displayed, broadcast or otherwise exploited in any manner without the express prior written permission from the editorial staff. The editorial staff. Site created by ProLabs. Russian version.