Russian Navy


AS-15



Project 1910 deep-water submersible. paralay.iboards.ru

AS-15 is a 1st rank nuclear-powered deep-water submersible of Project 1910.

REGISTRATION

Northern Fleet, Olenya Bay

CONSTRUCTION

The submersible was laid down on February 23, 1983 in Leningrad; launched on April 29, 1988; commissioned into Northern Fleet on December 30, 1991.

PERFORMANCE CHARACTERISTICS

Surface displacement: 1,390 tons
Submerged displacement: 2,000 tons
Submerged speed: 30 knots
Surface speed: 10 knots
Submergence depth: 1,000 meters
Length: 69 meters
Beam: 7 meters
Draft: 5.2 meters
Crew: 36 men

POWERPLANT

Main propulsion plant with nominal power of 10,000 hp; one nuclear reactor; one main and two auxiliary screws


Copyright © 1998-2012 RusNavy.com. All materials contained in this Website are protected by copyright laws and may not be reproduced, republished, distributed, transmitted, displayed, broadcast or otherwise exploited in any manner without the express prior written permission from the editorial staff. The editorial staff. Site created by ProLabs. Russian version.