Combat Capability [42%],
Role and Missions,
Structure of the Navy,
in-service ships, surface ships, submarines, chronology.
Tell a friend | Print version |
---|
B-187
B-187 at the Lima-97 arms show.
B-187 is a Project 877 diesel-electric submarine.
REGISTRATION
Pacific FleetCONSTRUCTION
The submarine was laid down at Leninsky Komsomol Shipyard (Komsomolsk, Far East) as a large-size sub in 1991 and put afloat on October 5, 1991.MILESTONES
In December 1991, acceptance certificate was signed. In 1992, the submarine was commissioned into Pacific Fleet.In 1997, being promoted abroad by Rosoboronexport, the submarine arrived in Malaysia (with a call at Cam Ranh, Vietnam) to participate in the Thai-97 and the Lima-97 arms exhibitions and effectively demonstrated her capabilities.
There is no information on the submarine's current status in the press. Supposedly, she is under repair.
PERFORMANCE
NATO classification: KiloSurface speed: 10 knots
Submerged speed: 17 knots
Operating depth: 240 meters
Test depth: 350 meters
Endurance: 45 days
Crew: 57 men
DIMENSIONS
Surface displacement: 2,300 tonsSubmerged displacement: 3,040 tons
Length overall (at design waterline): 72.6-73.8 meters
Beam overall: 9.9 meters
Mean draft (at design waterline): 6.2 meters