Combat Capability [42%],
Role and Missions,
Structure of the Navy,
in-service ships, surface ships, submarines, chronology.
Tell a friend | Print version |
---|
MPK-105
Project 1331M ship. Photo from atrinaflot.narod.ru
MPK-105 is a Project 1331M Small ASW Ship (SAS).
REGISTRATION
Baltic FleetCONSTRUCTION, NAME
The ship was laid down on December 30, 1985 at Peene-Werft shipyard (Wolgast, GDR); launched on November 20, 1986; commissioned on May 19, 1988.MILESTONES
In 1990, 1992 and 1993 being a part of ASW attack group, the ship won Navy Commander's Prize for ASW training.PERFORMANCE
Speed: 24.5 knotsOperational range: 2,200 miles at 12 knots
Crew: 80 men
DIMENSIONS
Displacement: 935 tonnesExtreme length: 75.2 meters
Extreme beam: 9.78 meters
Extreme draft: 2.8 meters
PROPULSION
3 diesels M-504A, total power 14,250 shpARMAMENT
2 MANPADS Strela-3 or Igla-1 launchers16 antiaircraft guided missiles 9M32M or 9M313
76-mm gun mount AK-176
30-mm 6-barelled gun mount AK-630
Osa-MA SAM launcher
2 coupled 533-mm torpedo tubes
2 RBU-6000 Smerch-2 antisubmarine rocket launchers
96 RGB-60 depth charge rockets
2 release tracks