05.08.2011
First Ukrainian patrol boat will be put into service roughly in Aug 2012, reports Interfax-Ukraine referring to Deputy Chief of Ukrainian Frontier Service Pavel Shisholin.
As for him, "construction of
Orlan-class patrol craft is currently in progress; this project was specially designed for Coast Guard Dept of Ukrainian Frontier Service. Another UAH 12-mln tranche was recently transferred for construction of the first serial boat", reports
Interfax-Ukraine.
According to reports of Ukrainian Frontier Service, state purpose-oriented program provides building of six
Coral-class patrol boats, eight
Orlan-class patrol boats, and 25 boats of other advanced projects within the period till 2020. In addition, in 2015 it is planned to lay down a multifunction patrol ship with displacement of about 1,000 tons and a helicopter on board.
The report is available for open access on
Ukrspecexport website.