Text: Press Service of JSC Zelenodolsk Shipyard
Photo: Gepard 3.9 class frigate. Press Service of JSC Zelenodolsk Shipyard
After successful sea- and acceptance trials, the second Gepard 3.9 class ship built by Zelenodolsk Shipyard was sent to the orderer.
Combat Capability [42%],
Role and Missions,
Structure of the Navy,
in-service ships, surface ships, submarines, chronology.
Tell a friend | Print version |
---|
Gepard class frigate was shipped to Vietnam
27.05.2011
The ship was loaded aboard the special-purpose transport vessel Eide Transporter on May 25 and shipped to Vietnam on May 26. Estimated duration of the cruise is 65 days.
As was earlier reported, all mechanisms, systems, and armament of the ship conform to the contract specifications and technical design.
The ship has improved navigability, maneuverability, dynamism, steering capabilities, and longer cruising range. The interior design was also changed with regard to the orderer's wishes expressed after the first frigate's delivery. According to experts, the second ship is more serviceable and easier to operate.
The ship was loaded aboard the special-purpose transport vessel Eide Transporter on May 25 and shipped to Vietnam on May 26. Estimated duration of the cruise is 65 days.
As was earlier reported, all mechanisms, systems, and armament of the ship conform to the contract specifications and technical design.
The ship has improved navigability, maneuverability, dynamism, steering capabilities, and longer cruising range. The interior design was also changed with regard to the orderer's wishes expressed after the first frigate's delivery. According to experts, the second ship is more serviceable and easier to operate.
Back to news list