Login

 

Forgot password?
Vote
Will Russian Black Sea Fleet leave Ukrainian territory in the near future?
 Hope so
 No
 Never!
History of votings
submarines shipbuilding Black Sea Fleet exercise Pacific Fleet Russian Navy Northern Fleet strategy cooperation Ukraine visits Russia piracy missiles trials Sevastopol history Sevmash presence contracts drills Baltic Fleet industry incident anti-piracy shipyards frigate training Gulf of Aden Somalia India developments reforms opinion Borei procurements policy Russia - India aircraft carrier Crimea arms exports USA St. Petersburg financing tests France Bulava Yury Dolgoruky US Navy Serdiukov Mediterranean cruise Zvezdochka NATO innovations United Shipbuilding Corporation Indian Navy Medvedev Arctic agreements commission Admiral Gorshkov Admiralteyskie Verfi Vladivostok Mistral accident hijacking corvettes overhaul Admiral Kuznetsov Russia - France anniversary Rosoboronexport Vysotsky ceremony event Yantar Severomorsk defense order negotiations conflict aircraft China deployment naval aviation Black Sea Putin investigations Varyag coast guard Novorossiysk Vikramaditya landing craft Far East crime marines Severnaya Verf meeting scandals memorials traditions Syria Japan statistics South Korea escort Yasen Neustrashimy tenders convoys Marshal Shaposhnikov Admiral Chabanenko Ukrainian Navy Severodvinsk Chirkov problems reinforcement tension firings tragedy technology frontier service Baltic Sea Caspian Flotilla Almaz Moskva provocation search and rescue hostages upgrade court Dmitry Donskoy keel laying rumors Turkey Kaliningrad Kilo class Petr Veliky World War II Atalanta helicopters Admiral Panteleyev shipwreck death Norway Rubin Admiral Vinogradov Russia-Norway launching delivery

 

Search
Our friends russian navy weapons world sailing ships
 
Tell a friend Print version

Zelenodolsk Shipyard masterfully executes production program

Zelenodolsk Shipyard masterfully executes production program 09.08.2011
Text: RusNavy.com
Photo: Project 745MB sea-going tug. vympel.ru
Zelenodolsk Shipyard launched two vessels on the eve of the Russian Navy Day – sea-going tug MB-12 and anti-terror boat Grachonok, told the yard's press service to Central Navy Portal.

The shipyard effectively executes this year's production program building ships both for Russian Navy and for export.

According to plans coordinated with Russian Navy command, patrol ship Dagestan is supposed to pass trials and join Caspian Flotilla in the current year. It is the first ship armed with the newest multipurpose missile system Caliber-NK. The ship is almost ready for towage to Novorossiysk Naval Base via inland watercourses; Dagestan will leave the shipyard in the nearest days.

Sea-going tug MB-12 for Northern Fleet was launched on July 30. It is the first tug of this kind built under modernized Project 745MB. Right after that, the first serial anti-terror boat Grachonok (hull number 982) was launched from the yard's slipways. Construction of Project Buyan-M small-size missile ships is actively going on. The hull of the lead one – Grad Sviyazhsk – has been almost completed and is being filled with equipment. The second ship – Uglich – was laid down on July 22; keel-laying of the third hull is scheduled on Aug 30, the Republic of Tatarstan Day.

Alongside with defense orders, Zelenodolsk Shipyard builds passenger vessels and river-sea class tankers. Launching ceremony of the first Project A-145 fast-speed passenger vessel will be held on Aug 16. The ship is designed for passenger transportations during Winter Olympics 2014 in Sochi.

Reference

Characteristics of Project 745MB sea-going rescue tug

Standard displacement – 1,125 tons; full displacement – 1,390 tons; dimensions: length – 56.5 meters, beam – 12.65 meters, draft – 4.3 meters; full speed – 14 knots; fuel range – 6,200 miles (at 13 knots); endurance – 30 days.

Powerplant: one 2,720-shp electric motor Schorch KL7540B-AS12, 2 x 1500-kW diesel generators, 2 x 300-kW diesel generators, 2 x 100-kW diesel generators.

Radioelectronics: two navigation radars Don. Crew – 22 men.

Characteristics of Project 21980 Grachonok anti-terror boat

Standard displacement – 138 tons; dimensions: length – 31.04 meters, beam – 7.4 meters, draft – 1.85 meters; full speed – 23 knots; fuel range – 200 miles; endurance – 5 days; powerplant – 2 diesels.

Armament: 4 MANPADS Igla, one 14.5-mm machinegun mount MTPU-14.5, 1x10 55-mm grenade launcher DP-65A (RG-55M), hand grenade launcher DP-64.

Radioelectronics: navigation radar MR-231, optical system MT-201.M3. Crew is 8 men.

Back to the list





Back to news list