Login

 

Forgot password?
submarines shipbuilding Black Sea Fleet exercise Pacific Fleet Russian Navy Northern Fleet strategy cooperation Ukraine visits Russia piracy missiles trials Sevastopol history Sevmash presence contracts drills Baltic Fleet industry incident anti-piracy shipyards Gulf of Aden frigate training Somalia India developments reforms opinion Borei procurements policy Russia - India aircraft carrier Crimea arms exports USA St. Petersburg France tests financing Bulava Yury Dolgoruky US Navy Serdiukov cruise Mediterranean Zvezdochka NATO innovations United Shipbuilding Corporation Indian Navy Medvedev Arctic agreements commission Admiralteyskie Verfi Admiral Gorshkov Vladivostok Mistral accident hijacking corvettes overhaul Admiral Kuznetsov anniversary Russia - France Vysotsky Rosoboronexport ceremony event Yantar Severomorsk negotiations defense order conflict aircraft China deployment naval aviation investigations Black Sea Putin Varyag coast guard Novorossiysk Vikramaditya landing craft crime Far East marines Severnaya Verf meeting scandals memorials traditions Syria statistics Japan escort South Korea Yasen Neustrashimy tenders Marshal Shaposhnikov Admiral Chabanenko convoys Ukrainian Navy problems Severodvinsk Chirkov reinforcement tension firings tragedy technology Baltic Sea search and rescue Almaz Moskva frontier service Caspian Flotilla provocation hostages upgrade court Dmitry Donskoy keel laying rumors Turkey World War II death shipwreck Admiral Panteleyev Atalanta Petr Veliky helicopters Kilo class Kaliningrad Admiral Vinogradov Norway Rubin delivery launching patrols
Search
Our friends russian navy weapons world sailing ships
 
Tell a friend Print version

Astrakhan Shipyard Builds Salvage Ship For Russian Navy

Astrakhan Shipyard Builds Salvage Ship For Russian Navy 09.11.2011
Text: RusNavy.com
Illustration: Model of Project 22870 ship. vympel.ru
Astrakhan Ship Repair Plant (affiliate of Zvezdochka shipyard) builds Project 22870 salvage ship for Caspian Flotilla (CF) Search and Rescue Service under Russian Navy's order.

The project developer is JSC Vympel Design Bureau (Nizhny Novgorod). The project documentation was developed under contract with JSC Zvezdochka Ship Repair Center and handed over to Astrakhan plant. The ship obtained serial number 05 and was laid down in summer 2011. Currently, the plant conducts hull works and purchases equipment. According to plan, the ship would be delivered in 2013, and there is no need to doubt of that, said a source in the yard to Central Navy Portal.

Throughout recent years, Astrakhan plant has acquired wide experience in defense order execution. Not long ago the plant had completed the second Project 705B harbor tug RB-10. The naval ensign will be hoisted on Nov 15, on the Caspian Flotilla Day. The first tug was built in Astrakhan and delivered in 2010 and has already approved herself. The third tug of this project is under construction and will also join Caspian Flotilla. It is planned to make an additional order for Project 705B tugs for Black Sea and Baltic fleets.

Construction of the new-generation salvage ship which is more than two times larger than Project 705B tug will bring the shipyard to the radically new level providing tugs and rescue ships for Russia's southern regions which are in need of auxiliary vessels.

Main purpose of Project 22870 ship is towage and bringing afloat vessels; fire extinguishing of damaged ships and coastal objects; evacuation and medical care of sufferers; power supply of damaged vessels and keeping them afloat; diving operations at depths down to 60 meters; surface oil pickup; search and research works.

Basic characteristics of Project 22870 salvage ship

Displacement – about 1,200 tons
Length overall – 57 meters
Beam overall – 14 meters
Amidships depth – 5.4 meters
Draft – 3.2 meters
Speed – about 14 knots

Back to the list





Back to news list