Text: Sevmash press service 
Photo: Offshore ice-resistant fixed oil platform Prirazlomnaya. 
Offshore ice-resistant fixed oil platform Prirazlomnaya will arrive at the operation site on Aug 27, reports Sevmash press service referring to Valery Borodin, the shipyard's Deputy Director General. 
 
									
								 
						
							 
 Combat Capability [42%],
Role and Missions,
Structure of the Navy, 
in-service ships, surface ships, submarines, chronology.
Combat Capability [42%],
Role and Missions,
Structure of the Navy, 
in-service ships, surface ships, submarines, chronology.													
																					
					 
																																						 
					| Tell a friend | Print version | 
|---|
Prirazlomnaya oil platform to arrive at operation site on Aug 27
08/22/2011|  |  | 
On Aug 19 oil platform Prirazlomnaya left Murmansk heading for its permanent "residence" – same-named oil field in the Pechora Bay. Average speed of movement is 2.7 knots. The unique platform has only 456 miles ahead to cover.
"Tentative date of the platform's arrival is Aug 27", said Valery Borodin, Deputy Director General of Sevmash shipyard. So far, everything goes on according to plans", he added.













 
 
 
	
 
										 




 
																											
																																						