Login

 

Forgot password?
submarines shipbuilding Black Sea Fleet exercise Pacific Fleet Russian Navy Northern Fleet strategy cooperation Ukraine visits Russia piracy missiles trials Sevastopol history Sevmash presence contracts drills Baltic Fleet industry incident anti-piracy shipyards Gulf of Aden frigate training Somalia India developments reforms opinion Borei policy procurements Russia - India aircraft carrier Crimea arms exports USA St. Petersburg tests France financing Bulava Yury Dolgoruky Serdiukov US Navy Mediterranean cruise Zvezdochka NATO innovations Indian Navy United Shipbuilding Corporation Medvedev Arctic agreements commission Admiralteyskie Verfi Admiral Gorshkov Vladivostok Mistral accident hijacking corvettes overhaul Admiral Kuznetsov Russia - France anniversary Rosoboronexport Vysotsky ceremony event Yantar Severomorsk defense order negotiations aircraft conflict China deployment naval aviation investigations Black Sea Putin Varyag coast guard Vikramaditya Novorossiysk landing craft Far East marines crime meeting Severnaya Verf scandals memorials traditions Syria statistics Japan South Korea escort Yasen Neustrashimy tenders Admiral Chabanenko Marshal Shaposhnikov convoys Ukrainian Navy problems Severodvinsk Chirkov reinforcement tension firings tragedy technology hostages Almaz provocation Moskva Caspian Flotilla frontier service Baltic Sea search and rescue upgrade court keel laying rumors Dmitry Donskoy Turkey shipwreck death Kaliningrad World War II Petr Veliky Admiral Panteleyev Atalanta helicopters Kilo class Admiral Vinogradov Norway Rubin patrols Russia-Norway launching
Search
Our friends russian navy weapons world sailing ships
 
Tell a friend Print version

K-154 Tigr


K-154 Tigr. Photo by D. Zuyev (submarines.narod.ru)

K-154 Tigr is a Project 971 Schuka-B 3rd generation nuclear-powered attack submarine. She represents the main project of Russian attack submarines.

REGISTRATION

Gadzhievo, Northern Fleet

CONSTRUCTION, NAME

The sub was laid down on September 10, 1989 at Sevmash shipyard in Severodvinsk; obtained the name of Tigr on July 24, 1991; launched on June 26, 1993; commissioned on January 21, 1994.

MILESTONES

In 1995 and 1996 the sub won the Navy Commander's Prize for antisubmarine firing.

Since 1998 till 2002 the sub had been under repair at Sevmash shipyard.

In 2002-2003 the sub carried out two patrols.

PERFORMANCE

NATO classification: Improved Akula
Surface speed: 11.6 knots
Submerged speed: 33 knots
Operating depth: 480 meters
Test depth: 600 meters
Endurance: 100 days
Crew: 73 men

DIMENSIONS

Surface displacement: 8,140 tons
Submerged displacement: 12,770 tons
Extreme length (at design waterline): 110.3 meters
Extreme beam: 13.6 meters
Mean draft (at design waterline): 9.7 meters

PROPULSION

Thermal nuclear reactor OK-650M (190 mW)
2 x 410 shp auxiliary motors
2 x 750 shp diesel generators DG-300

ARMAMENT

4 x 650-mm torpedo tubes (12 torpedoes)
4 x 533-mm torpedo tubes (28 torpedoes)
Rocket torpedoes
RK-55 Granat cruise missiles
3 launchers of MANPADS Strela-3M