Login

 

Forgot password?
submarines shipbuilding Black Sea Fleet exercise Pacific Fleet Russian Navy Northern Fleet strategy cooperation Ukraine visits Russia piracy missiles trials Sevastopol history Sevmash presence contracts drills Baltic Fleet industry incident anti-piracy shipyards Gulf of Aden frigate training Somalia India developments reforms opinion Borei policy procurements Russia - India aircraft carrier Crimea arms exports USA St. Petersburg France tests financing Bulava Yury Dolgoruky Serdiukov US Navy Mediterranean cruise Zvezdochka NATO innovations United Shipbuilding Corporation Indian Navy Medvedev Arctic agreements commission Admiralteyskie Verfi Admiral Gorshkov Mistral Vladivostok accident hijacking corvettes overhaul Admiral Kuznetsov anniversary Russia - France Rosoboronexport Vysotsky ceremony event Yantar Severomorsk defense order negotiations aircraft conflict China deployment naval aviation Putin Black Sea investigations Varyag coast guard Novorossiysk Vikramaditya landing craft crime Far East marines Severnaya Verf meeting scandals memorials traditions Syria South Korea Japan escort statistics Yasen Neustrashimy tenders Marshal Shaposhnikov Admiral Chabanenko convoys Ukrainian Navy problems Severodvinsk Chirkov reinforcement tension firings tragedy technology Baltic Sea Almaz Moskva frontier service search and rescue Caspian Flotilla hostages provocation upgrade court Dmitry Donskoy keel laying rumors Turkey World War II death Admiral Panteleyev Atalanta helicopters Kilo class shipwreck Petr Veliky Kaliningrad Admiral Vinogradov Norway Rubin launching patrols Russia-Norway
Search
Our friends russian navy weapons world sailing ships
 
Tell a friend Print version

K-154 Tigr


K-154 Tigr. Photo by D. Zuyev (submarines.narod.ru)

K-154 Tigr is a Project 971 Schuka-B 3rd generation nuclear-powered attack submarine. She represents the main project of Russian attack submarines.

REGISTRATION

Gadzhievo, Northern Fleet

CONSTRUCTION, NAME

The sub was laid down on September 10, 1989 at Sevmash shipyard in Severodvinsk; obtained the name of Tigr on July 24, 1991; launched on June 26, 1993; commissioned on January 21, 1994.

MILESTONES

In 1995 and 1996 the sub won the Navy Commander's Prize for antisubmarine firing.

Since 1998 till 2002 the sub had been under repair at Sevmash shipyard.

In 2002-2003 the sub carried out two patrols.

PERFORMANCE

NATO classification: Improved Akula
Surface speed: 11.6 knots
Submerged speed: 33 knots
Operating depth: 480 meters
Test depth: 600 meters
Endurance: 100 days
Crew: 73 men

DIMENSIONS

Surface displacement: 8,140 tons
Submerged displacement: 12,770 tons
Extreme length (at design waterline): 110.3 meters
Extreme beam: 13.6 meters
Mean draft (at design waterline): 9.7 meters

PROPULSION

Thermal nuclear reactor OK-650M (190 mW)
2 x 410 shp auxiliary motors
2 x 750 shp diesel generators DG-300

ARMAMENT

4 x 650-mm torpedo tubes (12 torpedoes)
4 x 533-mm torpedo tubes (28 torpedoes)
Rocket torpedoes
RK-55 Granat cruise missiles
3 launchers of MANPADS Strela-3M